OPC UA integration

Bring industrial information into Uplyst to connect equipment observations with production, maintenance and business operations.

Industrial data and asset context
Industrial observations retain their context

OPC UA information model

Nodes, attributes and relationships describe equipment, measurements and their place in a process.

Measurement information

Value and unit
What was measured
Status code
Quality of the reading
Source timestamp
Time assigned by the source to the value or status
Server timestamp
When the server knew it to be accurate

Connect industrial models to enterprise assets

OPC UA represents equipment information through nodes, attributes and relationships. Approved reads or subscriptions can bring selected variables and events into Uplyst, where they relate to assets, production orders and maintenance records.

Server identity, namespace context and node identifiers preserve the origin of each observation. Engineering units and model relationships describe what the measurement means and where it belongs in the process.

Keep measurement quality with the asset

OPC UA DataValues carry a value, status code and timestamps. Good, uncertain and bad readings have different uses; a failed measurement cannot be treated as a valid zero. Source and server timestamps retain the timing information supplied by the system.

In Uplyst, observations can be related to equipment, production lines and process stages. Those relationships support maintenance and quality decisions while keeping the age and reliability of each reading available.

Asset measurement qualityPress PR-17

Production context

  1. Plant West
  2. Forming line 2
  3. Press PR-17
Server
OT gateway 02
Namespace URI
urn:plant-west:forming
Production order
PO-6018

Hydraulic pressure

ns=2;s=PR17.Pressure
82.6bar
GoodAvailable for process analysis

Oil temperature

ns=2;s=PR17.Temperature
68.2°C
UncertainReview measurement reliability

Cycle speed

ns=2;s=PR17.Speed
Unavailablecycles/min
BadNo valid reading; never treated as zero
Pressure source timestamp
10:42:17.180 UTC
Pressure server timestamp
10:42:17.221 UTC

Node identity, engineering units and status remain attached to the asset. A failed reading stays unavailable in downstream analysis.

Sampling, subscriptions and data completeness

Monitored items sample attributes and apply filters; subscriptions deliver their notifications. Sampling intervals and publishing intervals serve different purposes, and the server can revise requested settings according to its capabilities.

Queue limits and discard policies affect the available history. Data change queues larger than one report an overflow when queued values are discarded. A queue size of one keeps only the latest value without an overflow indication. These settings determine whether an interval contains every reported change.

Source informationEnterprise interpretation
Node and namespace contextStable source reference
Value and engineering unitMeaningful measurement
Status codeQuality and validity
Source and server timestampsSource timing and server receipt or validity time

Trusted access to industrial information

OPC UA supports application authentication, secure communication and user authorisation. Certificates, trust lists and security policies define the permitted connection. Access remains within the approved industrial network architecture, using a gateway where appropriate.

Maintain context through industrial changes

Server interruptions, unavailable nodes and changes to the information model can affect the continuity of an asset view. Recovery uses the history and subscription capabilities available from the source. Missing intervals remain distinguishable from normal operation, and equipment writes or control stay within separately authorised workflows.

Connect your systems
with Uplyst.

Talk with our team about the systems you use and the decisions they need to support.

Discuss an integration